Another Complete Bathroom Remodel at
the Foster Harris House
Replace tub with shower - when showering, water would find it's way out onto floor which in part was responsible for the existing tile coming loose. When I got into the ripout, I found the original floor tile was installed on less than required subfloor and further inspection found that there were other structrual problems. All of these were corrected prior to installing new tile. Also, the 36" door was replaced with a 28" door to allow for additional shower width. The sheetrock was reworked, plumbing was rerouted and cleaned up, and electrical was cleaned up and rerouted |
|
|
Before
|
After
|
![]() |
|
![]() |
![]() |